BETHLEHEM TWP., Pa. — A project for nearly 200 residential lots to be built along Route 22 moved forward Wednesday as the township Zoning Hearing Board signed off on an open space adjustment.
The Jaindl Land Co. plan calls for turning four parcels — three north of Route 22 and one south — into 190 residential lots and open space.
A variance was required because the plan did not meet continuous open space requirements, and the method it is calculated by would require an adjustment…