California Gov. Gavin Newsom on Monday signed legislation that will allow the city to streamline the design and construction of a 400-acre terminal to construct and ship wind turbines to the northern part of the state.
The terminal, called Pier Wind, will allow for staging, storage and assembly of wind turbines that are as tall as the Eiffel Tower.
The cost for this work is estimated at $4.7 billion…